Site plan is a certificate that indicates area and the dimensions of the plot, duly issued by DHA Lahore office.
Service Timeline Charges Delivery
Site Plan Issuance 07 Days Rs. 2500 Building Control Branch
Documents Required
- 2 x Site Plan Application Forms.
- 1 x Photocopy of Allotment / Transfer Letter.
- 1 x Photocopy of Computerized National Identity Card of Client.
Procedure
- Site Plan Application Forms are available at Customer Care Services of DHA Office free of cost.(Download)
- Site Plan Application Forms along-with required documents will be submitted at Customer Care Services.
- Challan Form for dues will be issued from Finance Branch on given date.
- Original deposited challan has to be submitted to Finance Branch.
- Site Plan can be received from Customer Care Centre Counter No. 3 and 4, after 2 working days of payment of dues.
Site plan is a certificate that indicates area and the dimensions of the plot, duly issued by DHA Lahore office.
Services Timeline Charges Delivery
RESIDENTIAL
Submission of Building Drawings/Plans 20 working days Dwg Scrtny Fee Rs. 6/Sft
F.S Rs. 2/Sft
M.E.P Rs. 1/Sft
S.D Rs. 1/Sft
Total Fee = Rs. 10/Sft
Letter of approval will be dispatched to customer's address
Submission of Building Revised Drawings/Plans 20 working days @ Rs. 4 Per Sft
COMMERCIAL
Submission of Building Drawings/Plans 20 working days 2M: Dwg Scrtny Fee Rs. 30/Sft + F.S Rs. 8/Sft + M.E.P Rs. 3/Sft + S.D Rs. 3/Sft = Rs. 44/Sft
4M: Dwg Scrtny Fee Rs. 16/Sft + F.S Rs. 8/Sft + M.E.P Rs. 3/Sft + S.D Rs. 3/Sft = Rs. 30/Sft
8M: Dwg Scrtny Fee Rs. 20/Sft + F.S Rs. 8/Sft + M.E.P Rs. 5/Sft + S.D Rs. 5/Sft = Rs. 38/SftLetter of approval will be dispatched to customer's address
Submission of Building Revised Drawings/Plans 20 working days 2M: @ Rs. 28 Sft
4M: @ Rs. 10 Sft
8M: @ Rs. 10 Sft
Documents Required
- Original Architect Stability Certificate
- Original Structure Stability Certificate
- Form A & B (Cantonment Board). Filled with Owner’s Current Address
- Performa – Information Requirement Drawing Submission (Proposed / Revised)
- Submission Drawings: – (a). Architectural Drawing – 01 x Tracing Cloth, 07 x Ammonia Prints and 01 x Soft Copy in Form of CD. (b). Fire Protection Drawing – 02 x Ammonia Prints. (c). Structural Drawing – 01 x Set of Drawing and 01 x Soft copy of ETABS/ SAP Report (Commercial Only). (d). MEP Structure Drawing
- Covering letter from architect office
- MEP structure stability certificate
- 2 x set of hard copies of MEP structure drawings
- 1 x soft copy on CD having MEP drawing in PDF, ACAD 2(D) & 3-dimensional model.
- Original paid challan of Drawing Scrutiny Fee.
- Original Soil Testing Report / Geotechnical Test Report.
- Original paid challan of Soil Testing Report / Geotechnical Test Report.
- Photocopy of Allotment/ Transfer Letter.
- Photocopy of Site Plan Issued by Building Control Branch in Current Owner’s Name.
- Photocopy of CNIC of the Owner.
- Irrevocable Undertaking for Commercial/ Residential building construction in DHA Lahore (Specimen available with Customer Care).
- (Download) Complete Set
Note:
- All undertakings to be duly signed by owner and attested by the Oath Commissioner.
Procedure
- The Building drawing plan documents will be submitted to Customer Care Counter Nos. 6,7,8 & 9 for detailed checking.
- Customer Care Counter will issue payment slip for generation of challan by Finance Branch.
- The Customer Services Officer will issue payment challan according to the payment slip which will be paid in branches of banks mentioned on reverse of challan.
- A photocopy of paid challan will be attached with the Building Drawings / Plans along-with documents tagged in a file.
- Acknowledgment Slip will be issued to client for the submission of Building Drawings/Plans.
- After receiving the approval letter of drawing, member will visit Building Control Branch and get the Payment Slip for TIP Tax. Thereafter client will get the Payment Challan from Finance Branch for deposit in National Bank of Pakistan (NBP).
- Owner will provide 3 x Copies of Paid Challan to Building Control Branch and collect the Building Drawing / Plan.
Note
- After approval of Building Drawing / Plan, member will obtain demarcation from DHA Lahore, after which construction should commence within one month and completion of building within two years.
Service Timeline Charges Delivery
Issuance of No Demand Certificate As per Site & Phase requirement Security Charges & Non utilization fee (If applicable)
Any other charges as intimated by Finance BranchClient will be informed by Building Control Branch in case of construction violation in house / building.
Client will coordinate with Transfer & Record Branch and Finance Branch for payment of dues and date of transfer.
Documents Required
- Copy of Site Plan issued by Building Control Branch in name of present owner.
- Copy of Completion Certificate (in case of house / building).
- Copy of Allotment / Transfer Letter.
- Copy of Computerized National Identity Card of owner.
- No Objection Certificate from Cantt Board (relating to TIP Tax).
- No Objection Certificate from W&R Directorate, GHQ Rawalpindi in case of service benefit plots / plots allotted out of defence quota from GHQ AG’s Branch.
Procedure
- Client will submit No Demand Certificate Form along-with required documents to Customer Services Officer (Transfer & Record Branch).
- DHA field staff will visit the site in case of constructed house/building for ground verification.
- If construction violations are observed, owner will be informed on corresponding address or in case of no violation No Demand Certificate will be processed to Transfer & Records Branch through Finance Branch for clearance of dues and transfer of plot.
- The client can check the status and collect the Payment Challan from Finance Branch, DHA office.
Amalgamation Charges 2021-2022 (Residential / Commercial)
Documents Required
- Application dir to BC
- Photocopy of owner CNIC
- Photocopy of allotment letters
- Photocopy of site plans
Procedure
You are requested to submit following documents (in original) alongwith application to Director Transfer & Record DHA Lahore for amalgamation:-
- Deposit amalgamation fee Rs. /- through challan form. Challan form can be obtained from cash counter Finance Branch, DHA Lahore by showing this letter and submit original paid challan.
- Undertaking on FRS. 100/- stamp paper as per attached specimen duly attested by the Oath Commissioner.
- Original transfer letters of both plots.
- Original site plans of both plots.
- Photocopy of owner’s CNIC duly attested by the Oath Commissioner.
- 2 x Photographs (passport size) of owner duly attested by the Oath Commissioner.
Documents Required
- Application dir to BC
- Photocopy of owner CNIC
- Photocopy of allotment letter
- Photocopy of site plan
Procedure
You are requested to submit following documents (in original) alongwith application to Director Transfer & Record DHA Lahore for subdivision:-
- Original transfer letter.
- Original site plan.
- Affidavits on Rs. 100/- stamp paper as per attached specimen duly attested by the Oath Commissioner.
- Submit original paid challan of sub division fee Rs. /-
- Photocopy of CNIC of owner duly attested
- 2 x photographs (Passport size) of owner.
- 6 x Copies of ammonia print drawings for each sub-divided unit. Print should be as per approved plan/ drawings.
- Deposit Rs. 90,000/- (Rupees ninety thousand only) as separate sewer connection charges and Rs. 10,000/- (Rupees ten thousand only) as separate water connection charges through co challan form. Challan form can be obtained from cash counter of finance branch, DHA Lahore by showing this letter and submit original paid challan.
Demarcation of the plot is required before construction. This procedure takes place after the approval of Building Plans.
Service | Timeline | Charges | Delivery |
---|---|---|---|
Demarcation | 07 days | Nil | Building Control Branch |
Documents Required
- NOC for dues clearance from Finance.
- Demarcation and Pass Performa to be filled by the owner or DHA’s special power of attorney holder.
- Undertaking of “Own Water Supply Arrangements” on E-Stamp paper of Rs.100/- duly attested by the Oath Commissioner.
- Undertaking of “Stacking of Material and Temporary Hut” on E-Stamp Paper of worth Rs.100/- duly attested by the Oath Commissioner.
- Photocopy of ‘Drawing approval Letter’ issued by DHA.
- Original paid Challan of possession charges for all phases.
- Filled Performa – Tentative Work Schedule to be attached.
- In case of Basement, “Method of Basement Construction” to be attached as per specimen.
Note:
- Demarcation is valid for one month only in case construction activity has not commenced.
- After receiving the demarcation papers, Owner / DHA’s Special Power of Attorney Holder is bound to construct Septic Tank & Temporary Lavatory as per approved drawing within the plot area and both should be ready before the field staff visit.
Procedure
- Demarcation Forms are available at Customer Care Services, DHA Office.(Download)
- Complete set of documents and Demarcation Forms duly signed will be submitted to Customer Services Officer Building Control Branch.
- Client will be given an acknowledgment and date to obtain Demarcation Papers.
Service | Timeline | Charges | Delivery |
---|---|---|---|
Temporary Sewerage Connection | 12 Working Days | N/A | Temporary sewerage connectivity on site |
Documents Required
An application from owner to Director Building Control requesting for the opening of temporary sewerage connection. Download Application Form (Click Here)
Procedure
- Client can start the construction work after receiving demarcation papers and is bound to construct Septic Tank as per approved drawing and Temporary Lavatory within the plot area.
- The application for Temporary Sewerage Connection will be submitted to Customer Services Officer (Building Control Branch).
- Septic Tank & Temporary Lavatory (connected with each other) should be ready before the field staff visit within 10-12 working days.
- Temporary Sewerage Connection will be provided to particular house / building when Temporary Lavatory has been constructed and connected with Septic Tank.
Note:
- Photocopy of CNIC is required.
- Temporary Sewerage Connection will be provided to particular house / building when Temporary Lavatory has been constructed and connected with Septic Tank.
Service | Timeline | Charges | Delivery |
---|---|---|---|
New Water & Sewerage Connection | Subject to finishing of construction activities without construction violations | Water Connection Fee @ Rs. 10,000/- Sewerage Connection Fee @ Rs.5000/- | Water and Sewerage connections will be provided through main pipes on site |
Documents Required
- Application form duly filled by the Owner / Attorney
- Original and1 x photocopy of paid challan of Water & Sewerage Connection charges
- Photocopy of CNIC of the Owner / Attorney
- 2 x identical colored photographs of front elevation of house / building on photo paper (6” x 4” Size) showing complete elevation including beam area / driveway and paved area etc. In case of corner plot, 2 x additional photograph (6” x 4” Size) of side elevation are also required.
- 1 x Photocopy of Site Plan with current Owner’s name
- In case of 10KW or above Solar System is installed, attach a copy of bill from some renowned Solar System provider company on their letter head showing the purchase and installation date of the system. (For houses measuring 1 Kanal & Above) – if applicable
Note:
- After site visit by the field staff of building control branch and if satisfied with the construction as per approved drawing , having no construction violations, recommendation for opening of both the connections is made.
- Water & Sewerage Connection will be provided after flooring, plastering, gate, doors, windows, electrification, and plumbing of the house / building are ready.
Procedure
- Water & Sewerage Connection Forms are available at the Reception of Customer Care Services DHA Office free of cost .(Download)
- After collecting the Water & Sewerage Form client has to visit Customer Services Officer (Building Control Branch) for the preparation of Water & Sewerage Connection Charges.
- The client will pay the dues as per Payment Challan in the designated bank.
- Acknowledgment will be issued by Customer Care Services (Representative Building Control Branch).
- Water & Sewerage Connections will be provided after flooring, plastering, gate, doors, windows, electrification and plumbing of the house / building are ready.
- After site visit by the field staff of Building Control Branch and if satisfied with the construction as per approved drawing, having no construction violations, recommendation for opening of both the connections is made.
- After provision of Water Connection, previously installed water pump by the owner for construction activities will be removed according to DHA Construction Bye-laws.
- Sewerage Connection will be completely opened for the proper out flow after completion of above.
Service | Timeline | Charges | Delivery |
---|---|---|---|
Completion Certificate | 21 working days (subject to no violation) | Rs. 7000 | Completion Certificate will be delivered to the applicant's address. |
Procedure
Building Completion Performa (Download)
1. The Members are requested to apply and obtain the completion certificate of their houses / buildings from DHA, if not received earlier.
- Application should be on a plain paper addressed to the Director Building Control along with following documents:-
- 2 x identical colored photographs of front elevation of house / building on photo paper (6″ x 4″ Size) showing complete elevation including berm area / driveway and paved area etc. In case of corner plot, 2 x additional photographs (6″ x 4″ Size) of side elevation are also required.
- 2 x Set of approved drawing (Ammonia Prints)
- Original paid challan on account of Completion Certificate Fee.
- Photocopy of paid challan on account of “Late Completion Charges”. (If applicable)
- Photocopy of paid already challan of Water & Sewerage Connection.
- The Members are requested to apply and obtain the completion certificate of their houses / buildings from DHA, if not received earlier.Photocopy of DHA Letter regarding Sewerage Opening (Last paid bill of Water & Sewerage in case of Ex. Air Avenue Ph – VIII).
- Photocopy of paid challan on account of “Sewer Tempering Charges”.
- Photocopy of CNIC of the Owner / DHA Special Power of Attorney Holder.
2. It is also advised that the members who have made changes / deviations from approved drawing should submit revised drawing to regularize the construction before applying for Completion Certificate.
3. On receipt of application for Completion Certificate, DHA field staff will inspect the house / building to ascertain the factual position. If the House / Building is as per approved drawing and contains no construction violation, the Completion Certificate will be issued immediately otherwise observations will be communicated to the Member.
4. If Completion Certificate is not obtained within prescribed period, member shall have to pay fine as decided by the Authority.
5. Transfer of House / Building even on HIBA will not be processed without Completion Certificate.
6. Completion Certificate can also be applied online on DHA E-Services Portal i.e. https://eservices.dhalahore.org
7.Building Completion Performa (To be filled by the Owner at the time of Application for Completion Certificate)
Service | Timeline | Charges | Delivery |
---|---|---|---|
Duplicate Site Plan or Duplicate Completion Certificate | 12 working days | Duplicate Site Plan charges @ Rs. 2000/- Duplicate Completion Charges @ Rs. 2000/- | Building Control Branch |
Documents Required
- Application addressed to Director Building Control requesting for the issuance of Duplicate Site Plan or Completion Certificate.
- 1 x photocopy of Computerized National Identity Card.
- Original paid challan for the duplicate Site Plan charges or duplicate Completion Certificate.
- Copy of FIR (Regarding lost of house Completion Certificate).
- Copy of News Paper ad.
Procedure
- Application along-with above documents will be submitted to Building Control Branch, DHA office, through Customer Care Services.
- Customer Services Officer will issue an acknowledgment against the documents.
- Duplicate Site Plan or Completion Certificate will be issued to Owner / Attorney from Building Control Branch.
Service | Timeline | Charges | Delivery |
---|---|---|---|
Site Plan Issuance | Varies case to case | Varies case to case | Building Control Branch |
Documents Required
- Written application with details of intended Renovation / Repair works of house / building.
- Copy of Computerized National Identity Card of the owner / attorney.
- Copy of Allotment / Transfer Letter.
- Original Paid challan of Debris charges for Renovation.
- Undertaking for Renovation of Residential & Commercial Building (Download)
Procedure
- All the required documents will be submitted at the Customer Care Services (Building Control Section).
- DHA field staff will visit the site.
- Letter of approval will be dispatched to the owner to commence the Renovation/Repair of house / building.
Service | Timeline | Charges | Delivery |
---|---|---|---|
Refund of Security | 1 Month | Free of Cost | Finance Branch |
Documents Required
- Application from Owner / Attorney to Director Building Control.
- Copy of Computerized National Identity Card of Owner.
- Original Paid Challan.
Procedure
- The required documents will be submitted at Customer Care Services.
- DHA Management approves the refund of security to owner.
- A letter for collection of cheque from Finance Branch will be dispatched to the owner.
Documents Required
-
- Site plan in the name of current Owner of House/ Building as per DHA rule.
- Undertaking for DISMANTLE BUILDINGS RESIDENTIAL on E-Stamp paper worth Rs.100/- (as per specimen)
- Deposit a sum of Rs.50,000/- (Rupees Fifty Thousands Only) through attached challan form as Debris Security (Refundable).
Procedure
- The required documents will be submitted to the Customer Care Services.
- DHA field staff will visit the site.
- A letter will be dispatched along-with payment challan on account of Security Charges and specimen of undertaking (Download) for demolition of house / building to the Director Building Control.
- Copy of paid challan and undertaking on Rs. 100/- Stamp Paper will be submitted at the Customer Services Centre.
- Permission letter for Demolition of House/Building will be dispatched to the owner after verification of documents and inspection of house / building at site.
Documents Required
-
- Site plan in the name of current Owner of House/ Building as per DHA rule.
- Undertaking for DISMANTLE BUILDINGS RESIDENTIAL on E-Stamp paper worth Rs.100/- (as per specimen)
- Deposit a sum of Rs.50,000/- (Rupees Fifty Thousands Only) through attached challan form as Debris Security (Refundable).
Procedure
- The required documents will be submitted to the Customer Care Services.
- DHA field staff will visit the site.
- A letter will be dispatched along-with payment challan on account of Security Charges and specimen of undertaking (Download) for demolition of house / building to the Director Building Control.
- Copy of paid challan and undertaking on Rs. 100/- Stamp Paper will be submitted at the Customer Services Centre.
- Permission letter for Demolition of House/Building will be dispatched to the owner after verification of documents and inspection of house / building at site.
Service | Timeline | Charges | Delivery |
---|---|---|---|
Permission for use of Mechanical Excavator | 12 Working Days | Rs 25000/- Refundable Security | Permission letter will be dispatched to the customer's address. |
Documents Required
- Application from Owner to Director Building Control.
- Copy of Computerized National Identity Card of Owner.
Procedure
- The required documents will be submitted to the Customer Care Services.
- DHA field staff will visit the site.
- A letter will be dispatched to the applicant along with payment challan on account of security charges and specimen of undertaking (Download) for use of mechanical excavator.
- Copy of paid challan and undertaking on Rs 50/- Stamp Paper will be submitted at the Customer Care Services.
- Permission letter for use of excavator will be dispatched to the Owner’s address.
- NOTE: Excavation with excavator without permission will be charged for Rs. 50,000
Service | Timeline | Charges | Delivery |
---|---|---|---|
Use of Adjacent Plot as Lawn | 12 Working Days | Click Here for Schedule of Charges | Permission letter will be dispatched at the customer's address. |
There should be one owner of the plot and adjacent house or the owners should be relatives (Parents, Children, Husband/ Wife).
Documents Required
- Site Plan of House and Adjacent Plot.
- Copy of Allotment/Transfer letters of House and Adjacent Plot.
- Copy of Computerized National Identity Card of Owners.
- Application with signatures of both Owners if House and Adjacent Plot are not owned by same person.
Procedure
- The required documents should be submitted at the Customer Care Services.
- DHA field staff will visit the site.
- A letter will be dispatched along-with specimen of undertaking (Download) for use of adjacent plot as lawn to the applicant.
- Undertaking on Rs. 100/- Stamp Paper will be submitted at the Customer Care Services (Building Control Section) by the applicant.
- Approval letter will be sent to the Owner along-with Demarcation Forms to apply for Demarcation of the Plot.
- After physical demarcation the client can construct the boundary wall (around house & plot) and use the plot as lawn.
Service | Timeline | Charges | Delivery |
---|---|---|---|
Use of open plot for stacking of construction material | 08 Working Days | Free of cost | Permission letter will be dispatched at applicant's address. |
Documents Required
- Application from Owner / Attorney.
- Copy of Computerized National Identity Card of Owner.
Procedure
- The required documents should be submitted at the Customer Care Services.
- DHA field staff will visit the site.
- A letter will be dispatched to the applicant along-with specimen of undertaking (Download) for use of open plot for stacking of construction material and construction of temporary hut.
- Undertaking on Rs. 50/- Stamp Paper will be submitted at Customer Care Services by the applicant.
- Permission letter for use of open plot will be sent to the Owner / Attorney.
To Download Forms (Click Here)